Advanced Learning Moveable Case Study – Wichita Ks

Advanced Learning Moveable Case Study – Wichita Ks

The Advanced Learning Library is a state-of-the-art library located in Wichita, KS. The largest operable wall on this project is very unique in that the wall is Crystal glass on top with the bottom 36″ being a solid Signature. This rare combination helps in achieving the 12’7″ ceiling height requirement as well as a rare aesthetic touch. More importantly, the outstanding acoustical performance of the wall enables them to separate their sometimes-noisy lobby from their main library which requires absolute silence for readers or open the entire area up for large events. In addition, this wall allows for multiple configurations allowing or not allowing guest to use the stairs.

The Team

Architect

GLMV Architecture

General Contractor

Dondlinger Construction

Moderco Partner

Burns Boys Co.

Home

6634 Kaw Drive Kansas City, KS 66111
913-788-8654
kenziemcclain@bbckc.com

The Product

Product

Crystal 241 molded together with Signature 841

Panels

Single Panel

Stacking

Side Stacking

Glass

Double panel ¼” tempered glass

Track

#33-T Aluminum Track

Glass

Clear Tempered

Door Closure

Telescopic

Finish

Bottom Carnegie Xorel fabric on bottom and glass on top

STC

44

Accessories

Pass doors with panic hardware, lockable lever, & exit signs

Get a Quote

We Design, Engineer and Manufacture Operable Partition Systems