| Feature | Traditional Track & Trolley Walls | Vertical Lift Walls |
|---|---|---|
| Initial Cost | Low (Approx. 25% of Vertical Lift) | High (Approx. 4x Traditional) |
| Long-Term Cost | Lower (Easier and cheaper maintenance) | Higher (Complex, specialized parts/labor) |
| Space Flexibility | High (Multiple configurations, stack locations possible) | Low (Single function: up or down) |
| Design Flexibility | High (Allows integral pass doors, windows, writing surfaces) | Low (Cannot incorporate integral accessories) |
| Storage Impact | Low (Consumes floor/pocket space) | High (Frees up all floor space) |
| SEALS | |
|---|---|
| FA | Fixed top 1” (25mm) and Automatic bottom 2” (50mm) floor clearance |
| FM-1 | Fixed top 1” (25mm) and manually-operated bottom 1” (25mm) floor clearance |
| FM-1.5 | Fixed top 1” (25mm) and manually-operated bottom 1 1/2” (38mm) floor clearance |
| FM-2 | Fixed top 1” (25mm) and manually-operated bottom 2” (50mm) floor clearance |
| FM-2.5 | Fixed top 1” (25mm) and manually-operated bottom 2 1/2” (64mm) floor clearance |
| FM-4 | Fixed top 1” (25mm) and manually-operated bottom 4” (102mm) floor clearance |
| MM-1* | Manually-operated top 1” (25mm) and bottom 1” (25mm) floor clearance |
| MM-1.5* | Manually-operated top 1” (25mm) and bottom 1 1/2” (38mm) floor clearance |
| MM-2 | Manually-operated top 1” (25mm) and bottom 2” (50mm) floor clearance |
| MM-2.5 | Manually-operated top 1” (25mm) and bottom 2 1/2” (64mm) floor clearance |
| MM-4 | Manually-operated top 1” (25mm) and bottom 4” (102mm) floor clearance |
| MM-55* | Manually-operated top 1” (25mm) and bottom 1” (25mm) floor clearance with additional fixed top sweeps |
| FF | Fixed top 1” (25mm) and bottom 2” (50mm) floor clearance |
| FP | Fixed top 1” (25mm) and pneumatically-operated bottom 2” (50mm) floor clearance |