Team: General Contractor: Groupe Malo Architect: Bergeron Bouthillier Architectes
Interesting Fact / Project Highlight: Material delivery presented significant challenges due to the constraints of the historic building. In close collaboration with the general contractor, we developed an alternative solution by delivering the materials through the roof rather than using the stairways.
This project also marked our first installation featuring 1 ¾” thick sliding wood doors.